Hello all,
Although not typical, is there any provisions restricting the placement of a repad on top of an existing repad to come up with the required area per 831.4 and appendix F, and as long as the additional area needed is within the reinforcement zone, and applicable provisions followed? The second pad would be smaller in diameter so achieving required fillet size and placement of fillet would not be an issue.
Background: The pads in question are on some large bore branch connections and was realized (after installed) that the incorrect working stress of the repad material was utilized in determining the proportionate area needed.
Thanks!
Hello all,
Although not typical, is there any provisions restricting the placement of a repad on top of an existing repad to come up with the required area per 831.4 and appendix F, and as long as the additional area needed is within the reinforcement zone, and applicable provisions followed? The second pad would be smaller in diameter so achieving required fillet size and placement of fillet would not be an issue.
Background: The pads in question are on some large bore branch connections and was realized (after installed) that the incorrect working stress of the repad material was utilized in determining the proportionate area needed.
Thanks!