DaveAtkins
Structural
- Apr 15, 2002
- 2,869
I am working on a high rise addition, where the two upper floors of the existing high rise have braced frames. The diagonal members in these braced frames are overstressed when the addition loads are added.
The diagonal is a W18X143. I find that addding a C10X30 to each flange will increase ry sufficiently.
My question: do the channels need to run the full length of the W18? I am only trying to increase ry, not add area to the section.
DaveAtkins
The diagonal is a W18X143. I find that addding a C10X30 to each flange will increase ry sufficiently.
My question: do the channels need to run the full length of the W18? I am only trying to increase ry, not add area to the section.
DaveAtkins