Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Reliability Centred Maintenance analysis

Status
Not open for further replies.

0707

Petroleum
Jun 25, 2001
3,332
In the year 2000 we start a RBI programme for static equipment of our refinery. The aim of our analysis was to prepare the next turnaround in order to extend refinery cycle runs. After corrosion analysis and based on probability and consequence for a failure to occur we obtain a ranking risk matrix of the equipment. For our RBI analysis we fallow the API methodology. What are the recent news on this matters? What is forum experience with the use of API RBI software? For Reliability Centred Maintenance analysis of dynamic equipment is the approach method done the same way as for RBI in static equipment? Can you resume in few wards what are the main topic concerns for Reliability Centred Maintenance analysis?

Tank you

Excuse me for take your time.

Luis Marques
 
Replies continue below

Recommended for you

Status
Not open for further replies.

Part and Inventory Search

Sponsor