Banks
Structural
- Jul 21, 2004
- 23
I have a client that placed a beam in the wrong location. It's only 1" - 2" away from the right location, but I'm a little concerned about them trying to torch off the old weld and re-weld 2" away. Is this a valid concern or am I just being overly worried about something that wont' be an issue? Is there something more I should write in there other than "provide extreme care when removing weld?"
I should mention that the beam is supporting only the horizontal wind load from the glass curtain wall and is spanning about 14 feet.
I should mention that the beam is supporting only the horizontal wind load from the glass curtain wall and is spanning about 14 feet.