ALPER356
Structural
- Mar 8, 2009
- 2
Can anyone tell me how long I should wait before removing the forms and wood supports under an 8"x24" concrete beam spanning 12ft between columns for a residential terrace. I poured 3000 psi pump mix down here in South Florida? I hear after 7 days it gets 80% of its full strength but I'm getting different replies from different contractors.