Vertical-Eng
Structural
- Oct 30, 2019
- 6
I have a building with 4.5" concrete over 2" metal decking with a 5'x4' hole cut in it in order to bring up elevator machines. They want this filled in a repaired once the elevator mod is completed. I'm looking for examples or ideas on patching a hole this size.
I figured I could use a slightly oversized metal deck and shore it up and either weld (fillet or spot) around the perimeter. Or I could use concrete screw anchors to attach it. Then epoxy rebar that matches existing with proper development length, then pour concrete.
Please advise on where this might have problems or if you have any recommendations.
Thanks.