GreatGuy0123
Mechanical
- Jun 3, 2015
- 1
Hi Seniors,
Would someone please guide me in preparing an work plan (Method of statement) for replacement of Existing 04 Cooling Tower units (CT) with new 04 units.
I have a project that has o4 old cooling tower units that should be replaced with new 04 CT units. At present these old cooling tower are operating and meeting the cooling demand of the project building.
Thus, do anybody have similar case study or work plan or Method statement prototype to replace the cooling towers without affecting the cooling demand of the project. I mean, the building should continue to meet cooling demand while the replacement process is being carried.
Thank you in advance and i hope to get required info.
Would someone please guide me in preparing an work plan (Method of statement) for replacement of Existing 04 Cooling Tower units (CT) with new 04 units.
I have a project that has o4 old cooling tower units that should be replaced with new 04 CT units. At present these old cooling tower are operating and meeting the cooling demand of the project building.
Thus, do anybody have similar case study or work plan or Method statement prototype to replace the cooling towers without affecting the cooling demand of the project. I mean, the building should continue to meet cooling demand while the replacement process is being carried.
Thank you in advance and i hope to get required info.