ssn61
Mechanical
- Mar 30, 2010
- 72
I am in MEP field, and although it's not a technical question, I know a lot of you guys know the answer, which is greatly appreciated. When a contractor sends a submittal to an engineer for approval and the item submitted is not in the list of acceptable manufactures then how should the contractor provide the Request for Substitute. Should it go through GC then to PM, or GC to the engineer directly?