In our structural details we have the vertical bar in the open face of the wall that goes down to the footing and then continous along the bottom of the heel. (Please see attached drawing - top drawing has continous reinforcement and bottom drawing has spliced reinforcement)
However the rebar will be spliced due to transporting issues. The rebar will be placed along the bottom of the heel and then hooked up to the required spliced length. The concrete will then be placed up to the Construction Joint. Then the vertical rebar will be placed 2 inches above the construction joint and spliced to the reinforcement that has already been set in the concrete.
I am trying to find why the 2" clearance between the bottom of the vertical splice and the Construction Joint is required.
Really appreciate if you guys can give an explanation or possibly provide reference where this is addressed.
Thanks
However the rebar will be spliced due to transporting issues. The rebar will be placed along the bottom of the heel and then hooked up to the required spliced length. The concrete will then be placed up to the Construction Joint. Then the vertical rebar will be placed 2 inches above the construction joint and spliced to the reinforcement that has already been set in the concrete.
I am trying to find why the 2" clearance between the bottom of the vertical splice and the Construction Joint is required.
Really appreciate if you guys can give an explanation or possibly provide reference where this is addressed.
Thanks