kampho
Civil/Environmental
- Apr 10, 2003
- 5
Howdy all
I am an municipal engineer that does a lot of site and set-out surveying with a Set 5 Sokkia instrument and SDR 33 data recorder. It is often impossible for me to set up over a known point during construction and I am wondering what the accuracies of doing a resection are. I generally only do a 2 point resection but am beginning to think that I should be using at least 3 points. The way our boys off-set the points I give them probably doesn't warrant me being overly accurate but it would be nice to know if i am doing the right thing!
Cheers
I am an municipal engineer that does a lot of site and set-out surveying with a Set 5 Sokkia instrument and SDR 33 data recorder. It is often impossible for me to set up over a known point during construction and I am wondering what the accuracies of doing a resection are. I generally only do a 2 point resection but am beginning to think that I should be using at least 3 points. The way our boys off-set the points I give them probably doesn't warrant me being overly accurate but it would be nice to know if i am doing the right thing!
Cheers