This is more of a survey than a question. . . .
Assume that you are the engineer who has been asked the feasibility of constructing a basement under a dwelling that is yet to be built. A soil boring has been performed by a soil scientist which estimates the seasonal high water table to be 6 feet below existing grade (based upon soil mottling).
Question: at what depth should the basement floor be set relative to the soil boring data?
Assume that you are the engineer who has been asked the feasibility of constructing a basement under a dwelling that is yet to be built. A soil boring has been performed by a soil scientist which estimates the seasonal high water table to be 6 feet below existing grade (based upon soil mottling).
Question: at what depth should the basement floor be set relative to the soil boring data?