ckissick
Geotechnical
- Jul 12, 2006
- 26
I have a landslide repair job with a proposed stitch-pier wall. There will be a leach field right behind the wall, so the permit agency won't allow a subdrain system behind the wall. The active soil pressure would be 50 PCF if it were drained. If pore pressures can build up behind the wall, what total lateral pressure should be applied for design if soil and water pressures are both mobilized?