I am designing formwork for concrete walls and roof of only one-story heights. In doing so I assigned Risk Category 1 since the formwork is a temporary structure.
However the QC reviewer insists that wind loading, even for temporary formwork, must comply with the Risk Category of the structure upon completion.
This makes no sense to me. The formwork will be up for less than 60 days.
Would like to know if there’s something I’m missing?