OGEngin
Chemical
- Jan 23, 2008
- 2
I am in a situtuation where I need to install an RO into my pipeline to protect the downstream piping. The problem is that RO size needs to be 2 mm and therefore it might get plugged at some point. Does anyone have any experience of using a strainer upstream an RO to prevent the plugging? How should I size the strainer?
Thanks for your help!
Thanks for your help!