LJDub
Geotechnical
- Jun 1, 2011
- 3
I am involved in a project that is required to remove two dozen large sandstone boulders from a location that is about 100 meters downstream from a major dam. These boulders are approx. 10m x 5m x 3m in size. Would it be better to remove the rocks by breaking them into smaller sizes using blasting or rock breaking methods? Additional considerations/concerns are seismic activity on the embankment dam, economics, length of project, etc. Any thoughts would be helpful.
Thanks in advance.
Thanks in advance.