Have a client in oil and gas that wants to place equipment on a gravel pad. The pad would be approx 12" thick with an underlay. Underlying soil would be compacted. Geotech report gave compaction guidelines for the underlying soil, but nothing about compacting the gravel or the allowable bearing capacity. Frost line is about 3 ft.
I feel like the geotech should provide the bearing capacity. Thoughts?
Also, any experience out there on whether to expect a lot of movement from freeze thaw with gravel?
Thanks