din800
Civil/Environmental
- Oct 24, 2015
- 1
Hi everyone...
I am a newcomer for SAFE 2014 software. I have learn this software recently via youtube to design mat slab foundation. I have finish my design but need some advice on analysis result since my project site is very constraint. My question is:
1. How to overcome if slab deformation value exceed allowable limit. My proposed slab thickness is 600mm and i think its make sense for this project. The SBC is only 25kn/m2.
2. How to overcome if SBC is exceed allowable value. The site is very constraint to enlarge to size of mat.
3. How to check overturning in SAFE if the column load is unbalance. And also a settlement value. Is the settlement and deformation is same?
Thanks a lot in advance.
I am a newcomer for SAFE 2014 software. I have learn this software recently via youtube to design mat slab foundation. I have finish my design but need some advice on analysis result since my project site is very constraint. My question is:
1. How to overcome if slab deformation value exceed allowable limit. My proposed slab thickness is 600mm and i think its make sense for this project. The SBC is only 25kn/m2.
2. How to overcome if SBC is exceed allowable value. The site is very constraint to enlarge to size of mat.
3. How to check overturning in SAFE if the column load is unbalance. And also a settlement value. Is the settlement and deformation is same?
Thanks a lot in advance.