Hello everybody,
In SAP2000, I copy/replicate some structural elements and when I analyze structure again, I realize that SAP2000 had changed & assigned those copied & replicated frame elements into some other sections automatically. And just because of this, I have assign those frame sections again into the one I wish. When I replicate some elements, I want their sections to stay like they were before. But SAP200 changes it.
So, because of this, it takes time to assign the elements again and again. What can be the problem?
I will be glad if someone can help about it.
Regards,
Latif
In SAP2000, I copy/replicate some structural elements and when I analyze structure again, I realize that SAP2000 had changed & assigned those copied & replicated frame elements into some other sections automatically. And just because of this, I have assign those frame sections again into the one I wish. When I replicate some elements, I want their sections to stay like they were before. But SAP200 changes it.
So, because of this, it takes time to assign the elements again and again. What can be the problem?
I will be glad if someone can help about it.