ekincia
Geotechnical
- Jul 23, 2009
- 12
hi everyone
I am working on a phd project where we \re using Lambeth group clay (LL 60% PL 26% OMC 19% particle density 2.7)I have collected disturbed samples from site and remolded them into 100mm dia 200mm length mould applying specific compaction effort. I am trying to saturate the sample in triaxial equipment aplaying 50kpa cell and 30 kpa back presure. I have been waiting for few days and there is no hope. Anyone has any saggestions for making saturation process faster or possible .Concern is that during compaction samples from the site chopped into 10 to 15mm small pads and brought to OMC inorder to simulate site condition. I think this is causing some discontinuitys within the sample and not allow full saturation. Any comments, new ideas can help.
Thankyou
I am working on a phd project where we \re using Lambeth group clay (LL 60% PL 26% OMC 19% particle density 2.7)I have collected disturbed samples from site and remolded them into 100mm dia 200mm length mould applying specific compaction effort. I am trying to saturate the sample in triaxial equipment aplaying 50kpa cell and 30 kpa back presure. I have been waiting for few days and there is no hope. Anyone has any saggestions for making saturation process faster or possible .Concern is that during compaction samples from the site chopped into 10 to 15mm small pads and brought to OMC inorder to simulate site condition. I think this is causing some discontinuitys within the sample and not allow full saturation. Any comments, new ideas can help.
Thankyou