maintennance
Mechanical
- Jan 26, 2008
- 46
For one of the pump ( BB2 type), handling diesel, the seal flush plan recommended by the seal vendor is 11,65,72.The max suction pressure is 4.5 bar and the working temp is 139 Deg C ( Flash point is 120 Deg C). The vapour pressure is 0.07 bar.
My question here is , what is the criteria to select such a combination of seal flush plans? For such high temp, why 23,65,72 seal flush plan was not recommended by seal vendor?
For the buffer gas system( Nitrogen), the seal vendor has recommended the working pressure as 2.5 bar. What is the basis of arriving at the buffer gas pressure for 72 seal flush plan.Thanks to clarify.
My question here is , what is the criteria to select such a combination of seal flush plans? For such high temp, why 23,65,72 seal flush plan was not recommended by seal vendor?
For the buffer gas system( Nitrogen), the seal vendor has recommended the working pressure as 2.5 bar. What is the basis of arriving at the buffer gas pressure for 72 seal flush plan.Thanks to clarify.