FSS
Structural
- Sep 24, 1999
- 270
Where can I find in writing guidelines on whether drawings need to be sealed by a PE for federal projects? My primary interest is Florida, but with potential projects spread out in multiple states and the Carribean answers from any region would be appreciated. For example, Florida requires drawings for public record to be sealed (or something along those lines) but I have also heard that federal sites don't need sealed drawings. And so the confusion goes.