Are there any?
The quality control manager at my previous employer said that we were required to place on the drawing set general arrangement a reasonable facsimile of the code nameplate. I'm thinking that was required to comply with our quality manual, and not with the code per say, but in trying to confirm this I cannot see anything in the code regarding drawing requirements. I could be missing it...
--------------------------------
Fitter, happier, more productive
The quality control manager at my previous employer said that we were required to place on the drawing set general arrangement a reasonable facsimile of the code nameplate. I'm thinking that was required to comply with our quality manual, and not with the code per say, but in trying to confirm this I cannot see anything in the code regarding drawing requirements. I could be missing it...
--------------------------------