ForrestCam
Civil/Environmental
- Aug 20, 2015
- 4
Hi all, I am doing research on the construction method of laying 900mm and 600mm pipe underground by segmental tunnel (maybe referred to hand dig tunnel) which is 2m x 2m x 30m tunnel at 6m depth (invert level). could you let me have your view on which main components should be considered when designing the tunnel? any reference could be made to? grade I rock stratum is encountered at the depth of 2m.