Progit
Civil/Environmental
- Jan 29, 2013
- 1
Hello,we are constructing a three (3) suspended floor building, the grand floor is a car park
with concrete round columns of s 450mm by 2.8m, 3.6m and 4.2m height. the variation in Height is due to the nature of the site which is slanting (sloppy). my question is: we pour concrete into the 3.6 and 4.2 meters long concrete column forms at once but we observe segregation at the bottom i.e between the kickers and the column (about 100mm to 120mm) the mix ration is 1:2:4. what can we do better, we suspended casting after 4 columns already. Thank you in advance
with concrete round columns of s 450mm by 2.8m, 3.6m and 4.2m height. the variation in Height is due to the nature of the site which is slanting (sloppy). my question is: we pour concrete into the 3.6 and 4.2 meters long concrete column forms at once but we observe segregation at the bottom i.e between the kickers and the column (about 100mm to 120mm) the mix ration is 1:2:4. what can we do better, we suspended casting after 4 columns already. Thank you in advance