in the power plan we need to cool generator bye hydrogen..
in the filling station of hydrogen production unit how we can select the Cu alloy for the pipe conncted to capsul?
P compressor =120 bar
in the filling station of hydrogen production unit how we can select the Cu alloy for the pipe conncted to capsul?