jafcon1
Geotechnical
- Mar 28, 2004
- 4
I need to set boots/hikeups on rough grade lathes prior to undercutting for removal, replacement and compaction of a building pad. Other than setting the lenker rod to the proposed grade I'm confused about how to set the rod for the hikeups. Any suggestions on the best procedure?