Hello Everyone, I'm a new user of this forum.
I have in the past used solidworks, about 8 years ago, in another type of products. Today, in my current job we are pondering to switch to Solidworks. We need to see the pros and cons of switching to it.
I will have in a few days a trial version, but I would like with all of you, to see if it can fulfill my expectations.
-Is it possible in design in context to have a surface in one part, and link it to another, and maintain it linked (every time in 1st part we change it, in the linked part is updated).
-Is it possible in design in context, link bodies to another part?
-Imagine that I have 2 Assemblies. In assembly 1 I have a Coordinate system that defines the position of a part in assembly 2, is it possible to "link" that Coordinate system from Assembly 1 to Assembly 2, and create the mate to relate them? Do I have the need to redraw de coordinate system in Assembly 2 to mate the part? Or how should I behave?
-About parameters, is possible to have variables with multiple values? like the following video?
Can you show me with some info the answers to my questions with some information?
Many thanks.
Tiago Figueiredo
Tooling Engineer
Youtube channel:
I have in the past used solidworks, about 8 years ago, in another type of products. Today, in my current job we are pondering to switch to Solidworks. We need to see the pros and cons of switching to it.
I will have in a few days a trial version, but I would like with all of you, to see if it can fulfill my expectations.
-Is it possible in design in context to have a surface in one part, and link it to another, and maintain it linked (every time in 1st part we change it, in the linked part is updated).
-Is it possible in design in context, link bodies to another part?
-Imagine that I have 2 Assemblies. In assembly 1 I have a Coordinate system that defines the position of a part in assembly 2, is it possible to "link" that Coordinate system from Assembly 1 to Assembly 2, and create the mate to relate them? Do I have the need to redraw de coordinate system in Assembly 2 to mate the part? Or how should I behave?
-About parameters, is possible to have variables with multiple values? like the following video?
Can you show me with some info the answers to my questions with some information?
Many thanks.
Tiago Figueiredo
Tooling Engineer
Youtube channel: