antonio09
Mechanical
- Jun 7, 2003
- 7
I need to know the following. How i can size a sewer pump station of a new hotel complex. I have to option:
a. Use the total unit fixture discharge an change it to GPM in the table of demand.
b. Use the demand in galons per day per person in the hotel and estimate the peak demand (more and less 4 times).
The problem is the following: the quantity is very different in both option. Could anybody explain how i can size the pump capacity. (option a or b)
a. Use the total unit fixture discharge an change it to GPM in the table of demand.
b. Use the demand in galons per day per person in the hotel and estimate the peak demand (more and less 4 times).
The problem is the following: the quantity is very different in both option. Could anybody explain how i can size the pump capacity. (option a or b)