Shear Connector size/spacing Soldier Pile

Status
Not open for further replies.

BurgoEng

Structural
Joined
Apr 7, 2006
Messages
68
Location
US
How exactly do you go about sizing the Shear Connector(stud) for the connection of concrete facing wall to a steel soldier pile? I have assumed it's based on the horizontal shear stress created by the soil load on the concrete wall, treating the conc like a simply supported slab, but the results I get are making me rethink.

I have calculated a Max Shear on the facing of about 11 kips at the support end (pile location) based on a uniform load of 1.4k/ft(soil pressure at bottom of 30' wall), 10' span and 1.6 load factor. Then, using Shear = VQ/I I get 1.4k/in. So, considering a 12" section of the wall, I get 17 k of horizontal shear force. That would require me to use 5/8"dia studs at 6" (9kip/stud) but that seems awfully high.

Am I missing something or just being WAY to conservative?
 
For the many permanent tiedback walls I've designed, I always sized the shear studs for tension caused by the total lateral earth and surcharge pressures. I then sized the unreinforced concrete work pad to support the vertical weight of the concrete facing. For a 12" thick facing, usually a 2' wide, continuous, plain concrete pad is sufficient to accomodate a reasonable vertical load. Call me if you want to discuss this.
 