Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Shear Connector size/spacing Soldier Pile

Status
Not open for further replies.

BurgoEng

Structural
Apr 7, 2006
68
How exactly do you go about sizing the Shear Connector(stud) for the connection of concrete facing wall to a steel soldier pile? I have assumed it's based on the horizontal shear stress created by the soil load on the concrete wall, treating the conc like a simply supported slab, but the results I get are making me rethink.

I have calculated a Max Shear on the facing of about 11 kips at the support end (pile location) based on a uniform load of 1.4k/ft(soil pressure at bottom of 30' wall), 10' span and 1.6 load factor. Then, using Shear = VQ/I I get 1.4k/in. So, considering a 12" section of the wall, I get 17 k of horizontal shear force. That would require me to use 5/8"dia studs at 6" (9kip/stud) but that seems awfully high.

Am I missing something or just being WAY to conservative?
 
Replies continue below

Recommended for you

For the many permanent tiedback walls I've designed, I always sized the shear studs for tension caused by the total lateral earth and surcharge pressures. I then sized the unreinforced concrete work pad to support the vertical weight of the concrete facing. For a 12" thick facing, usually a 2' wide, continuous, plain concrete pad is sufficient to accomodate a reasonable vertical load. Call me if you want to discuss this.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor