bvbuf
Structural
- Jan 22, 2003
- 30
I'm designing a three story timber apartment building that is supported on a PT concrete podium in Kansas. At a meeting, the contractor said they normally see a "COP system" for shear wall hold downs. Anybody know what the "COP system" is?