We have to excavate about 12m below the ground level.The soil is sand. The water table is about 2m below the ground level. The client had purchased the sheet piles before the design was complete. As there are buildings and roads very close (approximately) 12m from the face of excavation,the sheet piles can not be anchored back.The sheet piles are of cantilever type.
The client has the piles in 12m length. So, we designed the sheet piling in a step like pattern. It is the first 6m depth of excavation will be carried out with 6m embedment depth. And then we have to drive another sheet pile , starting 6m below the ground level and goes down by 12m. So that the balance depth of excavation 6m can be carried out.
This lower level sheet pile wall also will have 6m embedment depth. In such condition, what should be the minimum distance to be maintained between the sheet pile walls? Please expalin how the overall stability of the excation/ sheet piling can be checked ?
The client has the piles in 12m length. So, we designed the sheet piling in a step like pattern. It is the first 6m depth of excavation will be carried out with 6m embedment depth. And then we have to drive another sheet pile , starting 6m below the ground level and goes down by 12m. So that the balance depth of excavation 6m can be carried out.
This lower level sheet pile wall also will have 6m embedment depth. In such condition, what should be the minimum distance to be maintained between the sheet pile walls? Please expalin how the overall stability of the excation/ sheet piling can be checked ?