The contractor for shotcrete and soil-nail retaining wall want to wait until there is 7-9 days of continuous sunny day in forecast to start. It is impossible to find such a period until summer.
They can cover the wall during rain but they are concern about the the water saturating soil behind the wall.
My question is how to do shotcrete with a chance of rain and what method/protection to mitigate it.