i am analysing a structure that has a big span of 30m, so i think trusses (of the roof) are unavoidable, and the columns needed are HEB type.
Most trusses (of SHS section)that i have seen in my short engineering life are just lying above concrete columns.
Do you think that connections between HEB-SHS sections in a building such as the one attached are easy to construct? Or the contractor will laugh at me (and i have better find a different solution)? :-D
i am analysing a structure that has a big span of 30m, so i think trusses (of the roof) are unavoidable, and the columns needed are HEB type.
Most trusses (of SHS section)that i have seen in my short engineering life are just lying above concrete columns.
Do you think that connections between HEB-SHS sections in a building such as the one attached are easy to construct? Or the contractor will laugh at me (and i have better find a different solution)? :-D