Hi experts,

Can any body suggest regarding time within which a shutdown valve of hydrocarbon export line should close.

Thanks
 
Replies continue below

Recommended for you

The last time I checked, offshore regulations permitted up to 45 seconds to close a shutdown valve. A throwdown number for valve closure is one second per inch body size. Some valves over NPS 24 may require quick exhaust valves to meet beat the 45 second requirement. My throwdown basis is spring-opposed ball valves. The number is reasonable for butterfly valves although they should close more quickly. If a faster closure is required you can work with the engineers to select larger actuators and tricked out pneumatic accessories.
 
I typcially use less than 1 minute.

If you put a speed controller on your air line, you can field adjust the speed of closing.



"Do not worry about your problems with mathematics, I assure you mine are far greater."
Albert Einstein
Have you read FAQ731-376 to make the best use of Eng-Tips Forums?
 
You might actually evaluate a need for faster closure than the maximum time allowed based on rupture flowrate, product loss, resultant contamination and health & safety risk. Are you in a high value facility, a sensitive habitat and can you minimize risk to personnal and equipment with a faster closure?

 
Just check for hammer. On fail close valve, I buy several different sinter bronze or aluminum vent filters. Each one has its own Cv and find the one that works for the valve.
 