I m not an expert in the field of executing and designing road
but I m working on an electrical substation project
Where I should submit the design of the access road
And I have this small issue
The area next to the site is super flat so i need to backfill couple of layer of subgrade and sub-base approx. 1m height before installing the pavement
My question is what should be the side slope of the road 1/1 1/2 1/3 ….
Note that the road only leads to the substation and my backfill is a cohesive clay soil