Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Simple question about time period 1

Status
Not open for further replies.

Fabi0

Mechanical
Joined
Apr 25, 2010
Messages
71
Location
IT
I've see that in some analisys, last time increment in .msg isn't equal to one, even if i set my time period to 1.

In my analisys there isn't time dependence for material or load (static hertz analisys).

From abaqus help, i understand that it's possibile convergence come before time period end....is it right?

FB
 
Are you sure the job completed? Check for errors.

Rob Stupplebeen
 
Are you looking at the time INCREMENT or the CUMULATIVE time. The increment in a non-linear analysis will rarely be 1.
 
If it is less than the total time then the job may have ended prematurely (could be due to no convergence, or maximum number of increments reached). Read the last part of the .msg file carefully (or post .msg and .sta files).

Nagi Elabbasi
Veryst Engineering
 
Thx all for reply!

I've read the end of .msg and i've undestand that what i believed to be the total STEP TIME COMPLETED was instead the TIME INCREMENT COMPLETED (so a fraction of total step time)!

That's why, reading...

TIME INCREMENT COMPLETED 0.175
FRACTION OF STEP COMPLETED 1.00
STEP TIME COMPLETED 1.00
TOTAL TIME COMPLETED 1.00

...i believed that analisys ended before total period time that i imposed in abaqus/cae!

FB
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top