SIMULIA Isight - Condition Equation

Status
Not open for further replies.

mdan90

Mechanical
Joined
Jan 3, 2016
Messages
16
Location
CA
Hello guys

In my Isight project, I have two variables A and B. The relationship between A and B should be that A is always double B. I tried Optimization1.A = 2*Optimization1.B and Optimization1A = Optimization1.B+Optimization1.B , but this weren't accepted. This is an optimization project BTW. Could anyone be kind enough to give me this condition equation?

Thanks
 