maweilian
Mechanical
- Sep 22, 2009
- 5
I am working on calculating the maximum allowable lateral working load that may be applied to a marine bollard that is sitting on top of a foundation that has a single pipe piling set 25ft deep. I have used Broms Method and the CLM2.0 spreadsheet to arrive at similar values. However, the bollard sits at the top of a tall river embankment. Thus, the riprap slope drops off in front of the bollard towards the river. The lateral force would come from vessel mooring lines and would therefore be pulling in the direction of the dropoff. My question is this: how far back must the bollard sit from the edge of the embankment for the maximum allowable loads I have calculated to be valid?
Thanks,
Will
Thanks,
Will