robotfood540
Civil/Environmental
- Mar 28, 2011
- 2
Hey guys, need some help. I was asked to size some gravity sewer feeding into a lift station, and also size the force main. A pump station handles 62.84 gpm downstream, but I need to figure what the peak flow is once it reaches the gravity sewer which flows to the main lift station in order to get the total peak flow going to the main lift station. How do I do that? I do not know pipe length, slope, or diameter. I am assuming the force main is Class 52 DI pipe.