I have 2 x 6.6kv, 1MW diesel gensets stepping up through a 2.5MVA 11/6.6kv YnD transformer. The application is standby/peak lopping.
I intend to install an earthing transformer at the 6.6kv terminals of the step-up transformer , and leave the generator neutrals disconnected.
How do I size the earthing transformer ?
I intend to install an earthing transformer at the 6.6kv terminals of the step-up transformer , and leave the generator neutrals disconnected.
How do I size the earthing transformer ?