pelelo
Geotechnical
- Aug 10, 2009
- 357
Hello,
I have been working on the monitoring system for 30 m high slope.
The software we use presents data such as distance, zenith and direction, all them measured in milimiters (mm).
The user manual doesnt provide the best information about this. I think i understand the distance plot which could be interpreted as the difference between the original position and the current position. About the zenith and direction I have been wondering if anyone knows any information about this as It has been very difficult to interpret by the engineers of this project.
Thanks
I have been working on the monitoring system for 30 m high slope.
The software we use presents data such as distance, zenith and direction, all them measured in milimiters (mm).
The user manual doesnt provide the best information about this. I think i understand the distance plot which could be interpreted as the difference between the original position and the current position. About the zenith and direction I have been wondering if anyone knows any information about this as It has been very difficult to interpret by the engineers of this project.
Thanks