I have a situation where there is not much space between the top of footing and underside of a warehouse slab on grade (55mm). At this stage it is likely too late to change the steel (pre-eng) and I would rather not add a little plinth to the footing to increase the gap but could if absolutely necessary.
I don't think the standard granular will compact well with such a small layer so I was considering using a clear stone aggregate or just filling the gap with concrete.
Anyone have thoughts or experience with such a small gap?
I don't think the standard granular will compact well with such a small layer so I was considering using a clear stone aggregate or just filling the gap with concrete.
Anyone have thoughts or experience with such a small gap?