MrMask
Electrical
- Sep 23, 2006
- 15
hi folks
the problem is the following:
we collected many measurements under certain conditions and create a "golden signature reference". Subsequent parts results are compared to the golden for dispositioning. This golden can be generated after a curve fitting or by averaging all measurements. At this stage, metrology noise is not an issue. Customer "A" insists in multiple measurements and argue that fitting is not acceptable as we use a monotonic function (residuals after fitting are normal, which would indicate the model is adequate). Well, multiple measurements would be a burden on certain fabs and we would like to avoid that as much as possible.
If someone could help me with some ideas or different approaches, it will be very much appreaciated
the problem is the following:
we collected many measurements under certain conditions and create a "golden signature reference". Subsequent parts results are compared to the golden for dispositioning. This golden can be generated after a curve fitting or by averaging all measurements. At this stage, metrology noise is not an issue. Customer "A" insists in multiple measurements and argue that fitting is not acceptable as we use a monotonic function (residuals after fitting are normal, which would indicate the model is adequate). Well, multiple measurements would be a burden on certain fabs and we would like to avoid that as much as possible.
If someone could help me with some ideas or different approaches, it will be very much appreaciated