oengineer
Structural
- Apr 25, 2011
- 731
I have a bid I am working on were I am given a specification that states the top 4 feet layer of soil is classified as firm to stiff clay with shell and gravel which is underlain by 12 feet layer of soft to stiff clay. It then says that foundations for major structures should be supported on Piles. I am providing the foundation Bill of Material estimates for the bid. I would like to verify that the 12 feet layer of soft to stiff clay is not good soil. I am writing the assumptions I used when preparing my engineering designs for the Bid and would like to verify.