Hi Dear All,
I am using ABAQUS to investigate the soil stressess around a buried pipe. I managed to simulate the geostatic condition successfully.
After Running this model, I have to excavate a trench in the soil profile. I went over the manual and I knew about the Model Change, Remove command. It works fine and reasonable results as long as I assign my region of excavation as Partioned sections of the original soil.
I tried to redo the model where I assigned each section to be excavated as a separate part and I assigned some contact interaction between The two soils. At this stage I would like to know what type of contact I have to select for the tangential and normal behavior when I deal with two soil that are self contact originally.
The second challenging phase of my simulation is the backfilling process. I went over the different posted replies and I came with the idea to split my steps into two separate parts one for the geostatic and excavation then I Transferr the results to Another ABAQUS/Standard model to apply the different new parts shapes and Material properties. I am still lost in doing this because I am completely confused how to import the results successfully in the new model to restart my analysis which the backfilling process.
thanks for anyone who can clarify me some tips or ideas.
best regards
Sherif
I am using ABAQUS to investigate the soil stressess around a buried pipe. I managed to simulate the geostatic condition successfully.
After Running this model, I have to excavate a trench in the soil profile. I went over the manual and I knew about the Model Change, Remove command. It works fine and reasonable results as long as I assign my region of excavation as Partioned sections of the original soil.
I tried to redo the model where I assigned each section to be excavated as a separate part and I assigned some contact interaction between The two soils. At this stage I would like to know what type of contact I have to select for the tangential and normal behavior when I deal with two soil that are self contact originally.
The second challenging phase of my simulation is the backfilling process. I went over the different posted replies and I came with the idea to split my steps into two separate parts one for the geostatic and excavation then I Transferr the results to Another ABAQUS/Standard model to apply the different new parts shapes and Material properties. I am still lost in doing this because I am completely confused how to import the results successfully in the new model to restart my analysis which the backfilling process.
thanks for anyone who can clarify me some tips or ideas.
best regards
Sherif