medhathafiz63
Structural
- Nov 8, 2013
- 1
Dears
we have a 15 km long road which is higher by about 3m above the natural level the proposed slope at the sides is 45 degree slope 1:1 the consultant required to have a concrete soil protection which costing a lot
can we substitute the system with other cheaper solution
we have a 15 km long road which is higher by about 3m above the natural level the proposed slope at the sides is 45 degree slope 1:1 the consultant required to have a concrete soil protection which costing a lot
can we substitute the system with other cheaper solution