Zeke
Civil/Environmental
- Jun 5, 2001
- 9
In a soil nail wall construction, the contractor placed the nail at the bottom of the excavated lift, then placed rebar and shotcrete, then excavated. The result is three nails do not have the shotcrete centered around the soil nails. Is the tributary area critical in this first layer of wall. There is a final layer that has rebar and shotcrete of five inches over this one once all lifts have been excavated. Do we keep going, or is repair work required?