Hello,
For a high rise building, and a sanitary riser that serves for example 12 stacking levels - is it acceptable to use solid core PVC in lieu of cast iron for a bathroom group riser? Obviously the potential concern would be noise. However, the project is adamant that they want to use PVC. Same question goes for storm risers.
Would it help to have riser pipe offsets every so many floors (or example every 4-5 floors)? This would slow down the slug of waste potentially.
This leads to another question, is there any requirement to have sanitary riser offsets every so many floors? There is obviously the requirement to have relief vent every so many floors, but have not heard of any requirement for an actual sanitary offset. This bathroom group riser would have a 4" sanitary riser, and a 3" vent riser.
Any offset requirement would not make sense either, as waste stack vent would not be possible as it can not have offsets (waste stack vent obviously not being used for bathroom group riser, but just for sake of argument for the offset discussion).
Thanks for any feedback
For a high rise building, and a sanitary riser that serves for example 12 stacking levels - is it acceptable to use solid core PVC in lieu of cast iron for a bathroom group riser? Obviously the potential concern would be noise. However, the project is adamant that they want to use PVC. Same question goes for storm risers.
Would it help to have riser pipe offsets every so many floors (or example every 4-5 floors)? This would slow down the slug of waste potentially.
This leads to another question, is there any requirement to have sanitary riser offsets every so many floors? There is obviously the requirement to have relief vent every so many floors, but have not heard of any requirement for an actual sanitary offset. This bathroom group riser would have a 4" sanitary riser, and a 3" vent riser.
Any offset requirement would not make sense either, as waste stack vent would not be possible as it can not have offsets (waste stack vent obviously not being used for bathroom group riser, but just for sake of argument for the offset discussion).
Thanks for any feedback