Can any one explain the purpose of the last inspection item on the form, referred to as "final, Directive 14". I have a case where I have been asked to provide special inspection for High strength bolt, welding and structural stability,for a small renovation job, however I have been additionally requested to sign off on the final inspection box. what is there more to be done by this final inspection?