- 6
I am designing a splitter box at the head of an SBR WWTP. The box will split the flow into either three or four paths. I intend to have the influent line dump into a small equalization basin, which will then feed to 3 or 4 lines equally as the water rises. The problem, though, is that the influent water has too much energy and is likely to rush violently to the farside of the equalization tank, rather than settle and rise. I've considered placing a baffle prior to the equalization tank. Does anyone have any other ideas?